Building a 2350 Space Robotic Parking Garage – Part 1

In just nine (9) months, Robotic Parking Systems manufactured, tested and shipped a record setting 210 machines for a new 2350 space automated parking facility.

This is the first of a multi-part series that will take you through the entire process of fabricating, assembling, testing, shipping and installing the machinery, automation components and electronics for this robotic parking garage.

Beginning in April 2014 with a bill of material consisting of about 2500 individual items, tens of thousands of parts and materials were ordered and began flooding into our manufacturing plant. Our vendors worked closely with us and were vital to our meeting an incredibly tight production schedule despite normally long lead times.

Robotic Parking Systems precision milling

Royce Monteverdi, CEO, stated, “Precision milling is critical in the fabrication of Robotic Parking Systems’ machinery. The fabrication teams must hold to very tight tolerances that are required for the assembly of the machines.”

Shipments began in September 2014 and by early January 2015 about 1300 tons of machinery, electronics and materials were shipped out in 98 ocean freight containers.

The installation crew began arriving on site in November 2014 to oversee the off loading of the machinery and electronics. Installation is in progress, and we’ll announce details about the project as we near the completion and opening of the facility.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s