Robotic Parking Systems Projects – Part 2 – Florida

Pinellas Park, Florida – 114 Spaces — Designed, built and have been operating a 114 space Robotic Parking System in Pinellas Park, Florida since 2006. This robotic parking garage serves as the company’s research, development and testing facility.

Robotic Parking System - Pinellas Park Project

Robotic Parking Systems, Inc. manufacturers its machinery from raw steel to finished product using off-the-shelf, high-quality electrical and mechanical components with L10 lifetimes of 40,000 hours or above. As part of its strategic partnership with Robotic Parking Systems, General Electric supplies all motors, electronics and automation controls for the company’s automated garages.

All of the automated parking machinery produced in the Clearwater, Florida factory undergo a 24 hour stress test and certification before being shipped to a job site. Rigorous quality control procedures are followed to ensure the flawless operation of the machinery and equipment being implemented in the field.

Robotic Parking System Specifications
Number of Spaces   114
Type of Garage   RPS 1000
Footprint   97 ft 2 in x 72 ft
Height    32 ft 5 in
Levels    4
Entry / Exit Terminals  2
Number of Years Operated  5 years

Advertisements

4 thoughts on “Robotic Parking Systems Projects – Part 2 – Florida”

      1. I would imagine that with China and India booming economically and car sales increasing there, that those would be prime areas of consideration. Of course China has a habit of stealing tech so one has to be careful about that.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s